Lighting System
Daytime Running Lights Control Unit Input Test
Remove the glove box lower panel and glove box.
Disconnect the 8-P and 4-P connectors from the daytime
running lights control unit.
Make the following input tests at the connector termi-
nals. If all tests prove OK, yet the system still fails to
work, replace the control unit.
4P CONNECTOR
PNK/WHT
YEL/BLK
PNK/BLK BLKBLK/RED
GRN/RED GRN/YEL
View from wire side 8-P CONNECTOR
DAYTIME RUNNING LIGHTS
CONTROL UNIT (Canada)
Daytime Running Lights Control Unit Input Test
Remove the glove box lower panel and glove box.
Disconnect the 8-P and 4-P connectors from the daytime
running lights control unit.
Make the following input tests at the connector termi-
nals. If all tests prove OK, yet the system still fails to
work, replace the control unit.
4P CONNECTOR
PNK/WHT
YEL/BLK
PNK/BLK BLKBLK/RED
GRN/RED GRN/YEL
View from wire side 8-P CONNECTOR
DAYTIME RUNNING LIGHTS
CONTROL UNIT (Canada)